Work Continued
Although they found those dead bodies, that didn’t mean that the project had to come to a halt. After all, the future of Niagara Falls was at stake. After clearing out the bodies, they continued removing loose rocks on the face of the cataract.
Much Needed Moisture
While some workers removed the loose rocks, engineers got to work installing a sprinkler system. Experts believed that part of the problem was the fact that the rock on the face of the waterfall was drying out and this sprinkler system would help with that.